💥 Gate Square Event: #PostToWinFLK 💥
Post original content on Gate Square related to FLK, the HODLer Airdrop, or Launchpool, and get a chance to share 200 FLK rewards!
📅 Event Period: Oct 15, 2025, 10:00 – Oct 24, 2025, 16:00 UTC
📌 Related Campaigns:
HODLer Airdrop 👉 https://www.gate.com/announcements/article/47573
Launchpool 👉 https://www.gate.com/announcements/article/47592
FLK Campaign Collection 👉 https://www.gate.com/announcements/article/47586
📌 How to Participate:
1️⃣ Post original content related to FLK or one of the above campaigns (HODLer Airdrop / Launchpool).
2️⃣ Content mu
Starry Sky Dynamics Aerospace has completed multiple key ground tests for the Ceres II launch vehicle.
Jin10 Data reported on August 12th that Galaxy Dynamics Aerospace announced today the completion of several key ground tests for the Ceres-2 launch vehicle in the recent period, including electrical system integration matching tests, control system hardware-in-the-loop simulation tests, full system thermal tests for the attitude control power system, joint tests for the first stage engine, joint tests for the second stage engine, static tests for the fairing, fairing separation tests, and joint drills between the launch vehicle and the rocket. The countdown for the maiden flight of the Ceres-2 launch vehicle has begun, which will carry 6 commercial satellites and 2 non-separable payloads, with a total payload exceeding 1 ton.