Conexão à rede de energia do projeto de energia solar distribuída no telhado da área do jardim Huanghua da Blue Think Technology (fase 1)

A Jinshi Technology report on August 6th stated that on August 5th, Lansi Technology held a grid-connected production ceremony for its photovoltaic power generation project at the Huanghua Garden District. This marks the grid-connected power generation of the distributed photovoltaic project (Phase 1) on the roof of the Huanghua Garden District. As an important part of Lansi Technology's 128.2MW distributed photovoltaic project, the total installed capacity of the Huanghua Garden District's roof distributed photovoltaic project is about 20MW, with a installed capacity of 16.17MW achieved in Phase 1.

Ver original
Esta página pode conter conteúdos de terceiros, que são fornecidos apenas para fins informativos (sem representações/garantias) e não devem ser considerados como uma aprovação dos seus pontos de vista pela Gate, nem como aconselhamento financeiro ou profissional. Consulte a Declaração de exoneração de responsabilidade para obter mais informações.
  • Recompensa
  • Comentar
  • Republicar
  • Partilhar
Comentar
0/400
Nenhum comentário
Negocie cripto em qualquer lugar e a qualquer hora
qrCode
Digitalizar para transferir a aplicação Gate
Novidades
Português (Portugal)
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)